After the Nov. 3 Vote, Brickell's Shade Keeps a Schedule
On Tuesday, Nov. 3, Miami's Historic and Environmental Preservation Board voted unanimously to accept Sierra Club Miami Group's withdrawal of its appeal over tree removal at 25 SE 10th St. That address is Allen Morris Brickell Park, the quarter-acre stand of banyan, black olive and gumbo limbo at Southeast 10th Street and Brickell Plaza. It has been fenced and chained since the July 4 weekend. With the appeal gone, nothing is left on the board's docket for that corner.
That corner was the one patch of public shade in Brickell's core that had no hours and no event to attend. You could just walk in. Brickell still has shade within reach, but almost all of it now runs on something: a park's opening and closing times, a nonprofit's event calendar, or a city construction timeline that starts next year.
Most of the Allen Morris Park dispute took place in hearing rooms. In order:
The withdrawal settled the procedural question without a ruling on the merits. The permits the city issued, covering five trees including a black olive with a trunk nearly six feet around, are no longer under appeal.
The near-term plan is a restaurant called Gavina, led by Stefano Secchi, the Michelin-starred chef behind Rezdôra in New York, the Miami Herald reported in August. The renderings show a wooden building with patios set among greenery, built around one of the lot's larger trees, a mature banyan. Javier Fernández, the developer's attorney, told the Herald the company would plant six new trees to make up for the ones being removed.
The longer-term plan is less settled. The site is zoned for high-density residential development. The Herald reported that one rendering carried small type reading "BRICKELL PARK - FUTURE SUPERTALL SALES CENTER." Fernández said a supertall had been discussed but had faced "challenges," and that "for now, it's Gavina." He also said the restaurant could later become a sales center and that he "wouldn't foreclose" a future park on the site. City Commissioner Rolando Escalona, whose district includes the park, told the Herald he does not support a high-rise there.
Neighbors were divided in the Herald's reporting. Community advocate Elena Kasparis started an online petition that drew nearly 2,000 signatures. Some residents of the Brickell Flatiron, across Southeast 10th Street, welcomed the idea of something new on the lot. Casey Piket, a Miami history blogger and longtime Brickell resident, put the broader point plainly to the Herald: "I look at what we have for green space in Brickell, and it just continues to narrow."
With the Southeast 10th Street park closed, the remaining green spaces in and around Brickell look like this as of publication:
| Place | Where | Access |
|---|---|---|
| Simpson Rockland Hammock Preserve Park | 55 SW 17 Road | Daily, 8 a.m. to 3 p.m. |
| Mary Brickell Park | On the bay, reached by the baywalk behind First Presbyterian Church | Lighted baywalk with benches |
| The Underline, Brickell Backyard | Under Metrorail, along SW 1st Avenue | Main trail open 24/7; Urban Gym and Flex Court 7 a.m. to 9 p.m. |
| Southside Park | 140 SW 11 St. | Closed until further notice |
The Herald describes the hammock as an eight-acre preserve south of Brickell's denser core. It has the deepest shade on this list and the shortest day, closing at 3 p.m. The City of Miami's park page lists a natural forest, trails, picnic tables and a recreation center. It also says the free half-mile naturalist walks have resumed on Saturdays and Sundays, at 10:30 to 11:30 a.m. and 1:30 to 2:30 p.m. Each walk is capped at 20 people, first come, first served. The park was closed Oct. 10 through 26 to set up its free Halloween event, which ran Oct. 22 and 23, so the trail is back to its usual schedule.
The Herald describes Mary Brickell Park as a two-acre bayfront park. The city's completed project behind First Presbyterian Church added 250 linear feet of new seawall, pedestrian lighting, benches and landscaping, plus connections to the baywalks on either side. Nearby, at 501 Brickell Avenue, the city lists the Brickell Park and Mausoleum Archaeological Zone. It contains a pre-Columbian Tequesta site and the Brickell family mausoleum, which was listed on the National Register in 1989.
Southside Park, on Brickell's west side, is listed by the city as closed until further notice. In August, the Herald reported that the developer of a Mercedes-Benz-branded condo tower was using it as a sales center and that the site's future was unclear.
Of the four, only The Underline is open after dark, and it has the most going on. The Brickell Backyard is laid out in rooms. The River Room has river views, butterfly gardens, a lawn and sculpture. The Promenade has bike and pedestrian paths, game tables, a shared dining table and an event stage. The Oolite Room adds more butterfly gardens and seating. The main trail is open around the clock.
Most of the activity follows The Underline's events calendar. The featured event on publication day is the Chewy Pack Walk, tonight, Thursday, Nov. 19, from 6:30 to 8 p.m. The Underline describes it as a community walk where dogs bring people together, and spots are reserved through the event listing. Earlier this month, the calendar included a free Bachata Night on Nov. 13 and free UYoga at the Urban Gym on the morning of Nov. 14. The same day brought The Underline Market to Inter Stage, 805 SW 1st Avenue, with local farmers, makers, produce, artisan goods, food and music.
Most of the open space left in Brickell's core is built around events like these. The lawn and the butterfly gardens are open to anyone at any hour. The busiest evenings, though, come from the calendar.
The next addition to Brickell's public waterfront is also on a schedule. The city's Brickell Bay Drive project, from Southeast 14th Street to Southeast 15th Road, pairs a new baywalk with roadway and drainage work. According to EXP's March 2026 announcement, the engineering firm the city picked as prime designer, the plans include a new linear greenway for cyclists and pedestrians and an 8-foot seawall replacing the existing 4.2-foot wall. The city's project page lists construction from February 2027 to January 2029. As of April 2026, design was 30% complete.
On the current schedule, the next new stretch of bayfront greenway in Brickell is more than two years away. Until then, the shade within walking distance is a hammock that closes at 3 p.m., a baywalk along the water, and a trail under the Metrorail whose busiest nights are listed on its calendar.
Our team follows these details because they shape what daily life in a Brickell building is like, from where you walk the dog at 7 p.m. to which corner of the neighborhood gets the next stretch of greenway. If you are weighing a move within Brickell or nearby and want a discreet read on how changes like these affect particular addresses, Ben Moss Group is glad to talk it through. Schedule a private consultation.
Ben has built his business by forming long-lasting relationships with his clients through providing diligent and analytical service, impeccable market knowledge, attention to detail and uncompromising ethical standards.
CONTACT US